Refine your search:     
Report No.
 - 
Search Results: Records 1-18 displayed on this page of 18
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

JAEA Reports

Demonstration of the groundwater observation network system in backfilled underground facility

Murakami, Hiroaki; Takeuchi, Ryuji; Iwatsuki, Teruki

JAEA-Technology 2022-022, 34 Pages, 2022/10

JAEA-Technology-2022-022.pdf:3.47MB

Japan Atomic Energy Agency (JAEA) has been conducting the hydro-pressure and hydrochemical monitoring for more than two decades to understand the hydrochemical disturbance due to the excavation of tunnels at Mizunami Underground Research Laboratory (MIU). To understand the environmental influence due to the backfilling of research tunnels that started in 2019, environmental monitoring of groundwater has been performed and recovery status of groundwater is being confirmed. In order to observe the deep-groundwater environment from the ground, the groundwater pressure monitoring and sampling, which have been performed in the research tunnel, are to be performed from the ground. However, backfilling of a large-scale underground facilities such as MIU is globally unprecedented, thus it was necessary to develop a new observation system. Accordingly, we developed a new observation network to observe the environment around the research tunnels of the MIU. This system enables monitoring of groundwater pressure and water sampling of the backfilled tunnel from the ground while utilizing the existing-monitoring system installed in the tunnels. Accordingly, we demonstrated its technology through the environmental monitoring of groundwater. The results of the environmental monitoring and the existing groundwater data of MIU indicate that this system is able to monitor the groundwater environment in the backfilled tunnels.

Journal Articles

In-situ backfilling experiment of the small scall drift by spray method in Mizunami Underground Research Laboratory, Japan

Matsui, Hiroya; Yahagi, Ryoji*; Ishizuka, Hikaru*; Toguri, Satohito*

WIT Transactions on Ecology and the Environment, Vol.247, p.145 - 159, 2020/00

In situ backfilling experiment using spray method in the small scale drift (approximately 4 by 3 m scale) was conducted at 500 m depth in Mizunami Underground Research Laboratory (MIU) established by JAEA (Japan Atomic Energy Agency). The backfill material consists of sand and bentonite. Specification for the backfill material was designed to satisfy the target permeability of generic host rock (10$$^{-8}$$ m/sec) assumed by NUMO. In this case, effective clay density should be 0.4 Mg/m$$^{3}$$ or more. Quality control of the material before backfilling was performed by setting the initial water contents (average 14%) based on the results of the laboratory testing and preliminary spray testing on ground surface. Densities of the backfilled material measured at any points satisfied the specification and the results suggested the establishment of the practical quality control methodology of the backfilling by spray method under actual deep geological environment. The in situ experiment was sponsored by METI (Ministry of Environment, Trade and Industry).

JAEA Reports

Backfilling test in drilling pits as part of Groundwater REcovery Experiment in Tunnel (GREET) Project

Takayasu, Kentaro; Onuki, Kenji*; Kawamoto, Koji*; Takayama, Yusuke; Mikake, Shinichiro; Sato, Toshinori; Onoe, Hironori; Takeuchi, Ryuji

JAEA-Technology 2017-011, 61 Pages, 2017/06

JAEA-Technology-2017-011.pdf:9.15MB

The Groundwater REcovery Experiment in Tunnel (GREET) was put into effect as development of drift backfilling technologies. This test was conducted by making the Closure Test Drift (CTD) recovered with water after carrying out a plug around 40m distance from northern edge face of horizontal tunnel of depth 500m, for the purpose of investigation of recovering process of rock mass and groundwater under the influence of excavation of tunnel. This report presents the efforts of backfilling investigation using bentonite composite soil and execution of backfilling into borehole pits excavated in the CTD which were carried out in fiscal 2014 as a part of GREET, and succeeding observation results inside pits from September 2014 to March 2016.

JAEA Reports

Studies on the reconstruction of the concept of rock mass around the tunnel; Japanese fiscal year, 2014 (Contract research)

Kojima, Keiji*; Onishi, Yuzo*; Aoki, Kenji*; Tochiyama, Osamu*; Nishigaki, Makoto*; Tosaka, Hiroyuki*; Yoshida, Hidekazu*; Murakami, Hiroaki; Sasao, Eiji

JAEA-Research 2015-017, 54 Pages, 2015/12

JAEA-Research-2015-017.pdf:17.3MB

This report is concerned with research to reconstruct more realistic near-field (NF) concept for the geological disposal of radioactive waste. This year is the final year of this committee activities. So we have carried out the summary on Re-thinking of NF concept and its technical basis. Cooperation between the study fields and combination of various science and technology and evaluation methods are one of the important technical bases of NF concept. In addition, since the "Great East Japan Earthquake 2011", the safety paradigm has shifted dramatically. In the reconstruction of realistic NF concept, it is necessary to analyze what security matters whether society has become unacceptable for geological disposal. Committee, we also exchange views on such matters and presented the direction of future research and development for geological disposal.

JAEA Reports

Investigations on repository layouts

Tanai, Kenji; Iwasa, Kengo; Hasegawa, Hiroshi; Goke, Mitsuo*; Horita, Masakuni*; Noda, Masaru*

JNC TN8400 99-044, 140 Pages, 1999/11

JNC-TN8400-99-044.pdf:7.85MB

This report consists of three items: (1)Study of the repository configuration, (2)Study of the surface facilities configuration for construction, operation and buckfilling, (3)Planning schedule, In the repository configuration, the basic factors influencing the design of the repository configuration are presented, and the results of studies of various possible repository configurations are presented for both hard and soft rock systems. Here, the minimum conditions regarding geological environment required to guide design are assumed, because it is difficult to determine the repository configuration without considering specific conditions of a disposal site. In the surface facility configuration, it is illustrated based on the results of construction, operation, buckfilling studies for underground disposal facility and EIS report of CANADA. In the schedule, the overall schedule corresponding to the repository layout is outlined in link with the milestone of disposal schedule set forth in the government's basic policy. The assumptions and the basic conditions are summarized to examine the General Schedule from start of construction to closure of a repository. This summaly is based on the technologies to be used for construction, operation and closure of a repository. The basic national policies form the framework for this review of the general schedule.

JAEA Reports

Backfilling of the underground facilities on a disposal site

Sugita, Yutaka; Fujita, Tomoo; Tanai, Kenji; Hasegawa, Hiroshi; Furuichi, Mitsuaki*; Okutsu, Kazuo*; Miura, K.*

JNC TN8400 99-039, 58 Pages, 1999/11

JNC-TN8400-99-039.pdf:3.19MB

Regarding disposal techniques of high-level radioactive waste (HLW), the HLW is vitrified and then stored for cooling for a period of 30 to 50 years. After cooling, the HLW is isolated in the deep underground. The concept of geological disposal is based on the requirement to enclose the HLW in the deep underground for the long-term durability of the human's environmental safety. Backfilling of a repository is a unique activity on the geological disposal. If underground tunnels excavated to construct the repository are left, they may have significant influences on the barrier performance of an entire repository, such as: the mechanical stability of a tunnel may be damaged by rock stresses and a tunnel may provide a fast pathway for ground water flow. Therefore, the underground facilities are expected to be backfilled with a backfilling material after emplacement of the HLW and a buffer material. The material for the backfilling of the underground facilities is backfilling material. In this report, bentonite-aggregate mixture is considered, as one of the candidate materials for the backfilling material. Aggregate imitates the muck that is generated during construction phase of the underground facilities. The combination of backfilling, plugging and grouting is considered in some underground situations. Plug is composed of concrete material or clay-based one. Grouting material is concrete material or clay-based one, too. In this report, the concept of the backfilling, mechanical and hydrological characteristics of the bentonite-aggregate mixture, the function, work methods and a schedule of the backfilling materials, plugging and grouting are considered, and items of quality control for the bentonite-aggregate mixture, concrete material and grouting are listed.

JAEA Reports

None

Kawamura, Kazuhiro

PNC TN8600 92-003, 110 Pages, 1992/01

PNC-TN8600-92-003.pdf:8.82MB

no abstracts in English

Journal Articles

Physical and chemical properties of bentonite-loam mixture as backfill materials

*; *; *; *

Proc. of the 1989 Joint Int. Waste Management Conf., Vol. 1, p.475 - 481, 1989/10

no abstracts in English

Oral presentation

The In-situ experiment for performance confirmation of engineered barrier system at Horonobe Underground Research Laboratory; Investigation and construction technique for backfill using rock spoil from URL excavation

Shirase, Mitsuyasu*; Niunoya, Sumio*; Yabuki, Yoshio*; Nakayama, Masashi; Ono, Hirokazu

no journal, , 

Japan Atomic Energy Agency is conducting the in-situ experiment for verification of performance of engineered barrier system in Horonobe Underground Research Laboratory. The purpose of this paper is reporting the investigation and construction technique for backfill using rock spoil from URL excavation. This paper also reports the results of quality control of in-situ measurements for backfill.

Oral presentation

A Applicability pretest of dielectric soil moisture sensors for monitoring of emplacement density of drift backfill materials

Sakaki, Toshihiro*; Sanada, Hiroyuki; Onuki, Kenji; Takeuchi, Ryuji

no journal, , 

no abstracts in English

Oral presentation

The In-situ verification of performance of engineered barrier system in Horonobe Underground Research Laboratory, 12; Study of quality control method on the in-situ compaction technique for backfilling

Tanai, Kenji; Kikuchi, Hirohito*; Nakayama, Masashi; Ono, Hirokazu; Shirase, Mitsuyasu*; Takahashi, Akihiro*; Niunoya, Sumio*; Kuriyama, Masanori*

no journal, , 

no abstracts in English

Oral presentation

Study on the production method of the tunnel backfill material

Tanai, Kenji; Mori, Takuo*; Fukaya, Masaaki*

no journal, , 

no abstracts in English

Oral presentation

Backfilling test in the groundwater recovery experiment, 1; Observation of saturation and swelling process

Takayasu, Kentaro; Takeuchi, Ryuji; Onoe, Hironori

no journal, , 

The Groundwater REcovery Experiment in Tunnel (GREET) is conducted by making the Closure Test Drift (CTD) recovered with water at the depth of 500m. Backfilling test is conducted as a part of GREET to acquire physical property change of the backfill material. Bentonite mixture was constructed into two pits excavated 1m in depth on the floor of the CTD. Hydraulic pressure, soil pressure and moisture content were measured to grasp the groundwater saturation process and the swelling process of backfill material. The moisture content in the pits got almost fully saturated till one month after. During water filling event, both hydraulic pressure and soil pressure reached 3.1 MPa at maximum. The swelling pressure of the backfill was calculated as 0.03-0.09 MPa. Observation inside the pit will be continued, and characteristics of backfill material will be investigated again. Changes of hydraulic pressure and soil pressure will be simulated and the construction method will be validated.

Oral presentation

Planning for in-situ backfilling test to the gallery in the Mizunami Underground Research Laboratory

Matsui, Hiroya; Yahagi, Ryoji*; Okihara, Mitsunobu*; Toguri, Satohito*

no journal, , 

This report describes the overall plan of in-situ test to backfill a part of Mizunami Underground Research Laboratory, which is planned for development of tunnel backfilling method.

Oral presentation

In-situ experiment for the backfilling in a small scale drift by spray method, 1; Selection of the material and machines

Yahagi, Ryoji*; Ishizuka, Hikaru*; Toguri, Satohito*; Matsui, Hiroya

no journal, , 

This repot summarize about the selection of the material and machines for in-situ experiment for the backfilling in a small scale drift by spray method funded by METI.

Oral presentation

In-situ experiment for the backfilling in a small scale drift by spray method, 2; The Results of in-situ experiment in MIU

Ishizuka, Hikaru*; Yahagi, Ryoji*; Toguri, Satohito*; Matsui, Hiroya

no journal, , 

This repot summarize about the results of the in-situ experiment for the backfilling in MIU by spray method funded by METI.

Oral presentation

The Mizunami Underground Research Laboratory Project; Drift back-filling technology

Takeuchi, Ryuji

no journal, , 

no abstracts in English

Oral presentation

In-situ experiment for the backfilling in a small scale drift by spray method, 3; Overview of the validation of the in-situ experiment

Matsui, Hiroya; Ozaki, Yusuke; Kawakubo, Shohei*; Chijimatsu, Masakazu*; Imai, Hisashi*

no journal, , 

no abstracts in English

18 (Records 1-18 displayed on this page)
  • 1